Custom vs Refacing vs RTA: What Cabinet Projects Really Cost

Three ways to get new cabinets — three very different budgets

Custom-built cabinets, refacing, and RTA (ready-to-assemble) sit at completely different price points, with different timelines and different quality ceilings. The regional comparison below covers Birmingham, Montgomery, and Hickory — including the premium Catawba Valley market.

LocationAreaServiceLowHighTimelineScope / Notes
BirminghamKitchenCustom Cabinets10,00030,0004 to 8 weeksHand-built custom replacement, solid hardwood, dovetail joinery, soft-close
BirminghamKitchenCabinet Refacing5,00015,0003 to 5 daysKeep frames, replace doors/drawers, veneer to match
BirminghamKitchenRTA Cabinets3,0008,0003 to 9 daysFlat-packed unassembled boxes, requires assembly
BirminghamBathroomCustom Vanities2,0006,0004 to 8 weeksMade-to-order moisture-resistant construction
BirminghamBathroomVanity Refacing1,0003,0003 to 5 daysKeep vanity frame, replace outer doors/drawers
MontgomeryKitchenCustom Cabinets10,00030,0004 to 8 weeksHand-built custom replacement, solid hardwood
MontgomeryKitchenCabinet Refacing5,00015,0003 to 5 daysKeep frames, replace doors/drawers
MontgomeryKitchenRTA Cabinets3,0008,0003 to 9 daysFlat-packed unassembled boxes
MontgomeryBathroomCustom Vanities2,0006,0004 to 8 weeksMade-to-order moisture-resistant
MontgomeryBathroomVanity Refacing1,0003,0003 to 5 daysKeep vanity frame, replace doors
HickoryKitchenCustom Cabinets12,00035,0004 to 8 weeksPremium Catawba Valley furniture-grade
HickoryKitchenCabinet Refacing6,00017,5003 to 5 daysKeep premium frame, replace fronts
HickoryKitchenRTA Cabinets3,6009,5003 to 9 daysAll-wood plywood construction
HickoryBathroomCustom Vanities2,5007,0004 to 8 weeksHand-crafted Catawba Valley
HickoryBathroomVanity Refacing1,2503,5003 to 5 daysKeep vanity box, replace doors

How to read this

Custom cabinetry is a 4-to-8-week investment with the longest life; refacing keeps your existing boxes and finishes in days at roughly half the cost; RTA is the entry point but the assembly quality is on you (or your installer). Solid hardwood construction beats particle board at every price point — which is why the premium Hickory numbers run higher.

Get matched with local pros

Use our free matching service to compare written quotes from pre-vetted cabinet professionals in your area — no obligation.

Related Articles

Compare your options: Browse all comparison guides →

Want help finding the right custom cabinets provider? Tell us what you're looking for and we'll help you connect with Birmingham providers who can help. Get matched with local providers → — no obligation.

Ready to Get Started?