Cabinet Refacing vs. Custom vs. Built-Ins: The Birmingham Diagnostic

Three ways to change your kitchen — refacing, full custom, or built-ins — and the right answer depends on your boxes, your budget, and how long you'll stay. In Birmingham, full custom kitchens run 10,000-30,000 and refacing runs 5,000-15,000 — exactly half, because refacing keeps your existing boxes and replaces doors, drawer fronts, and hardware.
What each path involves
- Refacing: new solid-wood doors and drawer fronts on your current boxes; 3-5 days; saves exactly 50% on fabrication.
- Full custom: new boxes, new layout, dovetail drawers, soft-close hardware; 4-8 weeks; built to your exact space.
- Built-ins: cabinets designed into the architecture — window seats, media walls, pantry systems; the premium option.
Take the 60-second diagnostic
1. Are your current boxes structurally sound (no swelling, no sag)?
The short version
- The diagnostic covers three paths, refacing, full custom and built-ins, with the answer depending on box condition, budget and how long the owner will stay.
- Birmingham figures quoted are $10,000-$30,000 for full custom and $5,000-$15,000 for refacing, exactly half because refacing keeps the existing boxes.
- Refacing means new solid-wood doors and drawer fronts on the current boxes over 3-5 days, saving 50% on fabrication.
- Full custom means new boxes and a new layout with dovetail drawers and soft-close hardware over 4-8 weeks, built to the exact space.
- The 60-second quiz asks four questions: whether the boxes are structurally sound, whether the layout works, whether you are staying 5+ years, and whether cost or quality is the priority.
2. Do you want a new kitchen layout, or does the current one work?
3. Are you staying 5+ years?
4. Budget priority:
Not sure which path fits? A vetted Birmingham pro can inspect your boxes and quote both paths — free, no obligation.